Category Archives: Commercial
Posted on November 16, 2020 by A F
With the tilt-up method, concrete elements (walls, columns, structural supports, etc.) are formed horizontally on a concrete slab; this normally requires the building floor as a building form but may be a temporary concrete casting surface near the building footprint.
After the concrete has cured, the elements are “tilted” to the vertical position with a crane and braced into position until the remaining building structural components (roofs, intermediate floors and walls) are secured.

Leave a comment
Posted on October 5, 2020 by A F
Our Business is Keeping You In Business.
Whether planning before a storm, or being responsive to a disaster, ParsCo is your one stop shop to handle it all.
When a potentially catastrophic storm comes to town, you should be able to depend upon a company that has experience helping others survive the process, not a here today – gone tomorrow operation.
ParsCo is the company that you can depend on time and time again.
From setting budgets, scheduling, vetting subcontractors, permitting, rebuilding and final inspections, ParsCo can professionally and effectively handle all your disaster-related and construction needs.
Contact us today to see why we are the only choice to help you ensure a truly successful recovery of your business.
Leave a comment
Posted on September 23, 2020 by A F
The path to recovery begins with defining an accurate property damage scope, working alongside the nations leading forensic building experts, environmental consultants and architects.
It continues with scheduling, vetting subcontractors, permitting, rebuilding and final inspections.
It ends with your property and business being back to pre-loss condition or better.
Leave a comment
Posted on August 7, 2020 by A F
Building modernization and renovation at an aerospace facility.
The scope includes installing an elevator to improve performance and safety.

Are you looking for a construction firm that specializes in:
Design/Build-
The renovation of mechanical systems for existing building structures-
The installation of new elevators-
The installation of access control systems-
The integration of new mechanical and lighting systems with Building Customization System controls-
Building Information Modeling implementation as part of the as-built requirements-
Maintaining a construction schedule during off-hours-
Contact Us
NAICS Code: 238290, 236220
SBA 8(a)

ParsCo is a member of the Society of American Military Engineers
Leave a comment
Posted on July 21, 2020 by A F
Cabinetry installation begins at Brent Lofts located in One Palafox Place.
Pensacola, Florida.
Leave a comment
Posted on December 6, 2019 by A F
ParsCo, LLC was recently awarded and honored at the construction industry’s premier awards program—The ABC Excellence in Construction Awards competition—that recognizes the outstanding merit shop project’s innovation, quality and vision of the project team—contractors, architects, engineers, owners and others—who have played a vital role in the project’s completion.

“The Excellence in Construction Awards recognizes and celebrates outstanding projects built by North Florida ABC members bi-annually. The awards competition serves to raise the level of construction standards throughout the industry by recognizing the workmanship of those who contribute and by showcasing the results of their dedication.”
Teamwork and cooperation between general contractors, specialty contractors, and material suppliers are prerequisites for building excellence into any construction project.
ABC of North Florida is the proud host of the Excellence in Construction Awards that honor the exceptional work created in the North Florida area. The EIC Awards event event took place at The Retreat at Bradley’s Pond in Tallahassee, FL on November 16, 2019.
Projects are judged on a variety of criteria such as safety, personnel management, quality control, scheduling and degree of difficulty.
2019 Winning Project
Marston Quina
A Historical Renovation
Pensacola, Florida
Leave a comment
Posted on October 26, 2019 by A F
As we leave October, block is being made ready to install at the Courtyard by Marriott – Pensacola West in preparation for the slab.
We have had a great experience thus far on this project with Southern Ventures.
This 124 room, 6 story hotel will be the first hotel in Florida as traffic comes into the state along the I-10 corridor from Alabama, and is situated at the apex of commercial development within Pensacola, just down the road from the Navy Federal Credit Union campus.
Leave a comment
Posted on October 16, 2019 by A F
ParsCo, LLC and our team including Cross and other local subcontractors are proud to be part of Tyndall Air Force Base’s mission to restore the base post Hurricane Michael.
We have started demolition of Hanger 5, the largest building on base and are making quick progress.
ParsCo looks forward to the future rebuilding efforts and restoring Tyndall AFB with our new construction team once we complete the demolition efforts.
Hangar 5, originally built in 1962, sustained significant damage during Hurricane Michael.
Leave a comment
Posted on May 23, 2019 by A F

Pensacola certified general contractor specializing in commercial construction.
Having completed construction on brands such as Marriott, Residence Inn, Ruby Slipper, assisted living centers and more…we understand the importance of maximizing functionality, design and maintaining aggressive completion schedules.
ParsCo is a full services Design-Build Florida construction company established to design and build projects and to form a strong client relationships based on exceptional quality, sound construction methods and good business practices.
Contact Us
Leave a comment
Posted on January 17, 2019 by A F
“Special thanks to ParsCo for the construction of our new offices. It went exceedingly smooth.”
– Chad Vuyovich, MAG Aerospace Director
MAG Aerospace, a leading provider of military intelligence, surveillance and reconnaissance services including manned and unmanned flights, dedicated a new 25,000-square-foot technology integration and support center (TISC) Friday January 11, 2018 on Anchors Street in Fort Walton Beach.
The new facility will be known as the Col. John T. Carney Center of Excellence in honor of John T. Carney, who led the first combat controller team during the first Gulf War. The center will be the first technology facility to house multiple military program offices, along with government representatives and commercial product engineers. That arrangement is designed to hasten innovation and get products and services more quickly into the field.
“In the past, special warfare ground operators would receive equipment directly from a program office that may or may not operate with other program office products or commercial off-the-shelf equipment,” said Chad Vuyovich, director of AFSOC Programs for MAG Aerospace.
MAG Aerospace will also use its new facility to help improve access to information on the battlefield.
ParsCo is very proud to have completed this construction project that will serve and defend the United States and it’s service members.

Learn more about MAG Aerospace.
Leave a comment