Expand Navigation
Address: 700 N. Devilliers, Pensacola, FL 32501 - Phone: (850) 696-7656 - info@pars-co.net - License #: CGC1512307

Hollowcore Plank

Posted on by ParsCo Construction

Typically, composite topping slabs are placed over the grouted hollow‐core precast slabs. Ultimately, this means greater freedom in design and architecture during and after construction as well as savings in material costs.

This entry was posted in Commercial, Engineering. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

 

All Rights Reserved © 2024. Site Designed By: CYber SYtes, Inc. Orchestrating the Web.